UK Manufacturer Cuts Carbon Emissions

SolarEdge system installed on complex rooftop in less than four weeks, enabling the owners to benefit from time-sensitive municipal grant.
Stalbridge, Dorset, UK / PV Rooftops

At a Glance:

  • Location: Stalbridge, Dorset, UK
  • Installed Capacity: 400kW PV system
  • Modules: 1000
  • Power Optimizers: 500 x P370
  • Inverters: 4 x SolarEdge 82.8kW Three Phase Inverters with Synergy Technology
Stalbridge, Dorset, UK / PV Rooftops

At a Glance:

  • Location: Stalbridge, Dorset, UK
  • Installed Capacity: 400kW PV system
  • Modules: 1000
  • Power Optimizers: 500 x P370
  • Inverters: 4 x SolarEdge 82.8kW Three Phase Inverters with Synergy Technology
William Hughes Dorset UK installed by Clean Earth Energy

The DC-optimized SolarEdge solution was chosen for its advantages in maximizing energy yields, built-in safety features, flexibility in accommodating challenging roof designs, and fast installation.

William Hughes Dorset UK installed by Clean Earth Energy

The DC-optimized SolarEdge solution was chosen for its advantages in maximizing energy yields, built-in safety features, flexibility in accommodating challenging roof designs, and fast installation.

Single Quote Single Quote
SolarEdge offers some of the longest warranties in the market, which fits perfectly with CleanEarth’s own ethos to design a 25-year plus lifespan into every system we install.
Single Quote Single Quote
Ed Lennon
/ Commercial Manager at CleanEarth, Green Energy Specialist

William Hughes manufacturing plant sought to reduce energy costs through PV.
However, their multiple-facet roof, hundreds of skylights, and inter-row shading could have prevented it. But SolarEdge Power Optimizers enabled flexible use of the roof because each pair of modules operate independently; underperformance in one would not impact others. Adding extremely efficient inverters - and they could enjoy high energy yields.

400kw William Hughes Dorset UK installed by Clean Earth Energy
  • Expectation to cut energy bills by approximately £35,000 and reduce carbon emissions by 100 tons per year 
  • Pinpointed performance and safety monitoring in real-time, reducing maintenance costs 
  • Advanced built-in safety features to protect people and equipment 
  • Flexible placement of modules
Single Quote Single Quote
The technology offers far more design flexibility than traditional string inverter systems.
Single Quote Single Quote
Ed Lennon
/ Commercial Manager at CleanEarth, Green Energy Specialist