Firmware Updates and Release Notes

Commercial Inverters (with SetApp)

Latest Firmware Version: 4.19.521

Release Date: November 2023

This release supports Three Phase Commercial Inverters and Three Phase Commercial Inverters with Synergy Technology.

Released Firmware Versions

ProductCPUDSP1DSP2Additional
Three Phase Commercial Inverter4.19.5211.13.22122.19.1806 
Three Phase Commercial Inverter
with PNs SExxK-xxxxIxxxx
4.19.5211.20.16482.20.1307 
Three Phase Inverter with Synergy Technology4.19.5211.13.22122.19.1806 
Three Phase Inverter with Synergy Technology
(up to 120kW) with
PNs SExxK-xxxxIxxxx
4.19.5211.20.16482.20.1307Synergy Manager:
0.4.9 / 1.1.9

 

New Features and Enhancements

  • SolarEdge Sense Connect
    • Sense Connect functionality is now supported on SolarEdge Three Phase 16K-17K inverters, protecting the PV Module (DC) side of the system. Power Optimizers continuously monitor the connector temperature on their short input and output cables and inform the inverter of any abnormal temperature increase so it can react accordingly
    • SetApp – Power Optimizer serial number is now displayed on Sense Connect alerts
  • Potential Induced Degradation (PID)
    • The ability to enable PID mitigation remotely is now supported for Three Phase Synergy Technology inverters via the Monitoring Platform. Go to the ‘Remote Settings’ menu in the Monitoring Platform’s ‘Admin’ tab to toggle the inverter’s PID Mitigation settings. Learn more here
  • SetApp Interface Updates
    • SetApp PID Activation menu: users can now differentiate between the built-in SolarEdge PID solution and an external third-party PID device
       SetApp PID Activation menu
    • Status SetApp page for Commercial inverters: added Sac, I1, I2, I3, V12, V23, V31 measurements as follows:

      Previous Screen
       image
      Updated Screen
      Updated Screen
    • SetApp Language Configuration
      • Language configuration is now performed via “SetApp side menu > Settings > Locale”, instead of via the “Commissioning > Country and Language” menu
        SetApp Language Configuration
  • Country table: made updates related to CA Rule 21 

 

Known Issues and Limitations

  • Optimizers P_OK and status list is populated after performing a Factory Reset. P_OK increases and the Power Optimizers status list in SetApp is also populated with the previously paired Power Optimizers
    • Workaround: After pairing is performed, the correct values will appear
  • Commercial Three Phase Inverters: when enabled, the inverter’s Active Export limit isn't updated to the SetApp status/site/limit field. However, the Active Export feature continues to function normally as configured
  • Central Settings (Leader, Follower): the Follower P(V) and Q(V) values are set to a different value than the Master
    • Workaround: Perform Central Commissioning to restore the correct values to the Follower inverter

Version: 4.18.514

 
Release Date: April 2023

This release supports Three Phase Commercial Inverters and Three Phase Commercial Inverters with Synergy Technology.

Released Firmware Versions

Products
CPU
DSP1
DSP2
Additional

Three Phase Commercial Inverter

4.18.514

1.13.2115

2.19.1700

Three Phase Commercial Inverter with PNs SExxK-xxxxIxxxx 

4.18.514

1.20.1518

2.20.1200

Three Phase Inverter with Synergy Technology

4.18.514

1.13.2115

2.19.1700

 

Three Phase Inverter with Synergy Technology (up to 120kW) with PNs SExxK-xxxxIxxxx

4.18.514

1.20.1518

2.20.1200

Synergy Manager:
0.3.7 / 1.0.8

New Features and Enhancements

Updated user interface related to the IEEE1547:2018 standard

  • Added installer configuration options - OLRT

  • Aligned parameters naming, types and ranges to new IEEE conventions

Known Issues and Limitations

  • Regarding the central settings (Leader inverter with Follower inverters), in some cases the country, grid and power values are not updated in the Follower inverters

    • Workaround: Try to configure the settings again

  • There is an error in the power limit display for the Three Phase Inverters with Synergy Technology (up to 120kW) during slow ramp up after a single Synergy Unit trips

Version: 4.17.615

 
Release Date: January 2023

Firmware for SetApp-enabled Three Phase Commercial Inverters and Three Phase Commercial Inverters with Synergy Technology was released in January 2023.

Inverter Firmware

The CPU version for all SetApp-enabled inverters is 4.17.615.

Device Firmware

Table 2: Inverters' firmware versions

Products
CPU
DSP1
DSP2
Additional

Three Phase Commercial Inverter

4.17.615

1.13.2018

2.19.1602

Three Phase Commercial Inverter with PNs SExxK-xxxxIxxxx 

4.17.615

1.20.1230

2.20.906

 

Three Phase Inverter with Synergy Technology

4.17.615

1.13.2018

2.19.1602

 

Three Phase Inverter with Synergy Technology (up to 120kW) with PNs SExxK-xxxxIxxxx

4.17.615

1.20.1230

2.20.906

Synergy Manager:
0.3.7 / 1.0.8

Release Notes

New Features and Enhancements

Firmware upgrades during site visits is now optional for inverters that were already commissioned and not connected to an Energy Meter. 

  • After connecting to the inverter using SetApp, if a new firmware version is available you may decide to delay the upgrade to a later time by tapping Skip Upgrade. 

  • Note: SolarEdge recommends upgrading inverter firmware whenever a new version is released

The SolarEdge Sense Connect feature is now supported on Three Phase Commercial Inverters and Three Phase Inverters with Synergy Technology, with DSP1 1.20.xxxx and DSP2 2.20.xxxx  

  • Sense Connect enhances system safety through early detection and prevention of potential electric arcs at the connector level due to improper connections or possible malfunctions resulting from wear and tear

Known issues and limitations

  • Three Phase Inverters with Synergy Technology (up to 120kW): Resetting the inverter during the Pre-Commissioning stage will shut down the system if the inverter is solar powered and a power bank is not connected

    • Workaround: If a reset is required, reconnect the power bank before resetting